Report Detail

The Europe Data Center Construction Market is estimated to be valued at US$ 11.0 Bn in 2018 end and is expected to touch a figure of nearly US$ 20.1 Bn by 2027 end representing a CAGR of 7.6% over the forecast period. The market is expected to gain traction owing to a rise in investment towards the development of technologically superior data centers and thus, provide numerous profitable opportunities for the Europe data center construction market players operating in the market.

The mechanical design of a data center infrastructure comprises of various components required for data center cooling, as cooling of the data center is one of the crucial issue owing to the increasing heat demands by the high-density servers. The mechanical design segment comprises of equipment such as HVAC; condensate drains, leak detection system, fire suppression unit, and raised the floor for environmental control. HVAC (heating, ventilation and air conditioning) systems help in controlling the ambient environment of the data centers, which includes humidity, temperature, air filtering, and air flow. Cooling in data centers utilizes a large portion of energy; thus, a proper HVAC system is a crucial decision in any data center construction. These systems may comprise of rooftop units as well as distributed units which allow localized air cooling. Thus, the growing temperature along with the rise in energy prices is projected to provide numerous profitable opportunities for a mechanical design for the Europe data center construction market players operating in the Europe data center construction market during the coming years.

The Europe data center construction market by cooling equipment, the HVAC (heating, ventilation and air conditioning) systems helps in controlling the ambient environment of the data centers, which includes humidity, temperature, air filtering, and air flow. It is a very critical component of any data center and is operated with other elements of data centers such as data storage, computing hardware, fire protection, cabling, power, and physical security. Cooling in data centers utilizes a large portion of energy; thus, a proper HVAC system is an essential decision in any data center construction. These systems may comprise of rooftop units as well as distributed units which allow localized air cooling. Furthermore, additional air handling and cooling may be needed between the racks. Thus, the cooling systems and equipment for data centers are expected to gain traction and subsequently, provide numerous profitable opportunities for the market players operating in the Europe data center construction market during the forecast period.

For the Europe data center construction market by general construction type, the exterior design of any data center infrastructure is a crucial decision to make while selecting a general contractor for data center construction, this includes proper roofing, cladding, flooring, steel construction, and others. Apart from major cities, data centers are also built in remote locations, and factors such as weather conditions and infrastructure are taken into consideration during construction. Furthermore, steel can be easily recycled and disassembled. On the other hand, the choice of flooring for data centers is also essential as per the requirements of data centers. As a result, the Europe data center construction market is poised to offer numerous profitable business opportunities for the Europe data center construction market players during the forecast period.

The Europe data center construction market by electrical design, the data center comprises a hierarchy of electrical devices, which helps in transmitting power from a utility feed to server racks. Some of the essential tools include utility feeds, switchgear, generators, UPS, PDUs, and others. Electrical supplies arriving at the data center infrastructure need to be transformed to a proper voltage level, which is performed by using a transformer. Whereas, switchgear helps in safely distributing power from the transformer or utility to the data center floor. Furthermore, generators and Uninterruptible Power Supply (UPS) deliver temporary and longer-term backup power. Power Distribution Units (PDU) helps in transmitting electricity or power to racks as well as standalone systems. Thus, the surge in demand for various electrical components for data center maintenance and operation is expected to provide significant business opportunities for the Europe data center construction market players during the forecast period.


TABLE OF CONTENTS

    PART 1. INTRODUCTION

    • 1.1 SCOPE OF THE STUDY
    • 1.2 THE INSIGHT PARTNERS RESEARCH REPORT GUIDANCE
    • 1.3 MARKET SEGMENTATION
      • 1.3.1 Europe Data Center Construction Market - By Type of Construction
      • 1.3.2 Europe Data Center Construction Market - By Tier Standards
      • 1.3.3 Europe Data Center Construction Market - By Industry Verticals
      • 1.3.4 Europe Data Center Construction Market - By Country

    PART 2. EUROPE DATA CENTER CONSTRUCTION MARKET - KEY TAKEAWAYS

      PART 3. RESEARCH METHODOLOGY

      • 3.1 COVERAGE
      • 3.2 SECONDARY RESEARCH
      • 3.3 PRIMARY RESEARCH

      PART 4. EUROPE DATA CENTER CONSTRUCTION MARKET LANDSCAPE

      • 4.1 MARKET OVERVIEW
      • 4.2 EUROPE PEST ANALYSIS

      PART 5. EUROPE DATA CENTER CONSTRUCTION MARKET - KEY INDUSTRY DYNAMICS

      • 5.1 KEY MARKET DRIVERS
        • 5.1.1 Emergence of distributed IT and edge computing saw an increase in the number of data center being used
        • 5.1.2 Rapidly increasing data traffic
        • 5.1.3 High EBITDA margins in the infrastructure sector
        • 5.1.4 Development in analytical capabilities for effective decision making
      • 5.2 KEY MARKET RESTRAINTS
        • 5.2.1 High Capex, OpEx & TCO for building Data Center
        • 5.2.2 Complex infrastructure
        • 5.2.3 Emergence of containerized data center
      • 5.3 KEY MARKET OPPORTUNITIES
        • 5.3.1 Growth in adoption of hyper scale data center to generate opportunity for the market
        • 5.3.2 Growth in Green Data Center
        • 5.3.3 Constant growth in number of data center construction
      • 5.4 FUTURE TRENDS
        • 5.4.1 Colocation and cloud services are expected to gain the larger pie of the market
        • 5.4.2 Technological complexity and need for security will drive the growth in near future
      • 5.5 IMPACT ANALYSIS OF DRIVERS AND RESTRAINTS

      PART 6. DATA CENTER CONSTRUCTION -EUROPE MARKET ANALYSIS

      • 6.1 EUROPE DATA CENTER CONSTRUCTION MARKET OVERVIEW
      • 6.2 EUROPE DATA CENTER CONSTRUCTION MARKET FORECAST AND ANALYSIS

      PART 7. EUROPE DATA CENTER CONSTRUCTION MARKET ANALYSIS - BY TYPES OF CONSTRUCTION

      • 7.1 OVERVIEW
      • 7.2 EUROPE DATA CENTER CONSTRUCTION MARKET BREAKDOWN, BY TYPES OF CONSTRUCTION, 2018 & 2027
      • 7.3 GENERAL CONSTRUCTION
        • 7.3.1 Overview
        • 7.3.2 Europe Data Center Construction Market, By General Construction Revenue and Forecasts to 2027 (US$ Mn)
      • 7.4 ELECTRICAL DESIGN
        • 7.4.1 Overview
        • 7.4.2 Europe Data Center Construction Market, By Light Sensor Market Revenue and Forecasts to 2027 (US$ Mn)
        • 7.4.3 UPS
          • 7.4.3.1 Overview
          • 7.4.3.2 Europe Data Center Construction Market, By UPS Market Revenue and Forecasts to 2027 (US$ Mn)
        • 7.4.4 Generators
          • 7.4.4.1 Overview
          • 7.4.4.2 Europe Data Center Construction Market, By Generators Market Revenue and Forecasts to 2027 (US$ Mn)
        • 7.4.5 PDU
          • 7.4.5.1 Overview
          • 7.4.5.2 Europe Data Center Construction Market, By PDU Market Revenue and Forecasts to 2027 (US$ Mn)
        • 7.4.6 Transfer Switchgear
          • 7.4.6.1 Overview
          • 7.4.6.2 Europe Data Center Construction Market, By Transfer Switchgear Market Revenue and Forecasts to 2027

        (US$ Mn)

        • 7.4.7 Others
          • 7.4.7.1 Overview
          • 7.4.7.2 Europe Data Center Construction Market, By Others Market Revenue and Forecasts to 2027 (US$ Mn)
      • 7.5 MECHANICAL DESIGN
        • 7.5.1 Overview
        • 7.5.2 Europe Data Center Construction Market, By Mechanical Design Market Revenue and Forecasts to 2027 (US$ Mn)
        • 7.5.3 HVAC
          • 7.5.3.1 Overview
          • 7.5.3.2 Europe Data Center Construction Market, By HVAC Market Revenue and Forecasts to 2027 (US$ Mn)
        • 7.5.4 Other Cooling Equipment
          • 7.5.4.1 Overview
          • 7.5.4.2 Europe Data Center Construction Market, By Other Cooling Equipment Market Revenue and Forecasts to 2027 (US$ Mn)

        PART 8. EUROPE DATA CENTER CONSTRUCTION MARKET ANALYSIS - BY TIER STANDARDS

        • 8.1 OVERVIEW
        • 8.2 EUROPE DATA CENTER CONSTRUCTION MARKET BREAKDOWN, BY TIER STANDARDS, 2018 & 2027
        • 8.3 TIER 1 & 2
          • 8.3.1 Overview
          • 8.3.2 Europe Data Center Construction Market, By Tier 1 & Tier 2 and Forecasts to 2027 (US$ Mn)
        • 8.4 TIER 3
          • 8.4.1 Overview
          • 8.4.2 Europe Data Center Construction Market, By TIER 3 Market Revenue and Forecasts to 2027 (US$ Mn)
        • 8.5 TIER 4
          • 8.5.1 Overview
          • 8.5.2 Europe Data Center Construction Market, By TIER 4 Market Revenue and Forecasts to 2027 (US$ Mn)

        PART 9. EUROPE DATA CENTER CONSTRUCTION MARKET ANALYSIS - BY INDUSTRY VERTICAL

        • 9.1 OVERVIEW
        • 9.2 EUROPE DATA CENTER CONSTRUCTION MARKET BREAKDOWN, BY INDUSTRY VERTICAL, 2018 & 2027
        • 9.3 BFSI
          • 9.3.1 Overview
          • 9.3.2 Europe Data Center Construction Market, By BFSI Market Revenue and Forecasts to 2027 (US$ Mn)
        • 9.4 GOVERNMENT
          • 9.4.1 Overview
          • 9.4.2 Europe Data Center Construction Market, By Government Market Revenue and Forecasts to 2027 (US$ Mn)
        • 9.5 TECHNOLOGY
          • 9.5.1 Overview
          • 9.5.2 Europe Data Center Construction Market, By Technology Market Revenue and Forecasts to 2027 (US$ Mn)
        • 9.6 TELECOM MEDIA & ENTERTAINMENT
          • 9.6.1 Overview
          • 9.6.2 Europe Data Center Construction Market, By Telecom, Media & Entertainment Market Revenue and Forecasts to 2027 (US$ Mn)
        • 9.7 RETAIL
          • 9.7.1 Overview
          • 9.7.2 Europe Data Center Construction Market, By Retail Market Revenue and Forecasts to 2027 (US$ Mn)
        • 9.8 HEALTHCARE
          • 9.8.1 Overview
          • 9.8.2 Europe Data Center Construction Market, By Healthcare Market Revenue and Forecasts to 2027 (US$ Mn)
        • 9.9 OTHERS
          • 9.9.1 Overview
          • 9.9.2 Europe Data Center Construction Market, By Others Application Market Revenue and Forecasts to 2027 (US$ Mn)

        PART 10. EUROPE DATA CENTER CONSTRUCTION MARKET - COUNTRY ANALYSIS

        • 10.1 OVERVIEW
          • 10.1.1 Europe Data Center Construction Market Breakdown, by Key Countries
            • 10.1.1.1 France Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
            • 10.1.1.1.1 France Data Center Construction Market Breakdown by Type Of Construction
            • 10.1.1.1.2 France Data Center Construction Market Breakdown by Tier Standards
            • 10.1.1.1.3 France Data Center Construction Market Breakdown by Industry Verticals
            • 10.1.1.2 UK Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
            • 10.1.1.2.1 UK Data Center Construction Market Breakdown by Type Of Construction
            • 10.1.1.2.2 UK Data Center Construction Market Breakdown by Tier Standards
            • 10.1.1.2.3 UK Data Center Construction Market Breakdown by Industry Verticals
            • 10.1.1.3 Germany Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
            • 10.1.1.3.1 Germany Data Center Construction Market Breakdown by Type Of Construction
            • 10.1.1.3.2 Germany Data Center Construction Market Breakdown by Tier Standards
            • 10.1.1.3.3 Germany Data Center Construction Market Breakdown by Industry Verticals
            • 10.1.1.4 Netherlands Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
            • 10.1.1.4.1 Netherlands Data Center Construction Market Breakdown by Type Of Construction
            • 10.1.1.4.2 Netherlands Data Center Construction Market Breakdown by Tier Standards
            • 10.1.1.4.3 Netherlands Data Center Construction Market Breakdown by Industry Verticals
            • 10.1.1.5 Ireland Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
            • 10.1.1.5.1 Ireland Data Center Construction Market Breakdown by Type Of Construction
            • 10.1.1.5.2 Ireland Data Center Construction Market Breakdown by Tier Standards
            • 10.1.1.5.3 Ireland Data Center Construction Market Breakdown by Industry Verticals
            • 10.1.1.6 Denmark Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
            • 10.1.1.6.1 Denmark Data Center Construction Market Breakdown by Type Of Construction
            • 10.1.1.6.2 Denmark Data Center Construction Market Breakdown by Tier Standards
            • 10.1.1.6.3 Denmark Data Center Construction Market Breakdown by Industry Verticals
            • 10.1.1.7 Belgium Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
            • 10.1.1.7.1 Belgium Data Center Construction Market Breakdown by Type Of Construction
            • 10.1.1.7.2 Belgium Data Center Construction Market Breakdown by Tier Standards
            • 10.1.1.7.3 Belgium Data Center Construction Market Breakdown by Industry Verticals
            • 10.1.1.8 Rest of Europe Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
            • 10.1.1.8.1 Rest of Europe Data Center Construction Market Breakdown by Type Of Construction

            Design Type

            • 10.1.1.8.2 Rest of Europe Data Center Construction Market Breakdown by Tier Standards
            • 10.1.1.8.3 Rest of Europe Data Center Construction Market Breakdown by Industry Verticals

            PART 11. INDUSTRY LANDSCAPE

            • 11.1 OVERVIEW
            • 11.2 MARKET INITIATIVE

            PART 12. EUROPE DATA CENTER CONSTRUCTION MARKET - KEY COMPANY PROFILES

            • 12.1 AECOM INC.
              • 12.1.1 Key Facts
              • 12.1.2 Business Description
              • 12.1.3 Financial Overview
              • 12.1.4 SWOT Analysis
              • 12.1.5 Key Developments
            • 12.2 ARUP
              • 12.2.1 Key Facts
              • 12.2.2 Business Description
              • 12.2.3 Financial Overview
              • 12.2.4 SWOT Analysis
              • 12.2.5 Key Developments
            • 12.3 CAP INGELEC SAS
              • 12.3.1 Key Facts
              • 12.3.2 Business Description
              • 12.3.3 Financial Overview
              • 12.3.4 SWOT Analysis
              • 12.3.5 Key Developments
            • 12.4 ISG PLC
              • 12.4.1 Key Facts
              • 12.4.2 Business Description
              • 12.4.3 Financial Overview
              • 12.4.4 SWOT Analysis
              • 12.4.5 Key Developments
            • 12.5 JACOBS
              • 12.5.1 Key Facts
              • 12.5.2 Business Description
              • 12.5.3 Financial Overview
              • 12.5.4 SWOT Analysis
              • 12.5.5 Key Developments
            • 12.6 JOHN SISK & SON
              • 12.6.1 Key Facts
              • 12.6.2 Business Description
              • 12.6.3 Financial Overview
              • 12.6.4 SWOT Analysis
              • 12.6.5 Key Developments
            • 12.7 JONES ENGINEERING GROUP
              • 12.7.1 Key Facts
              • 12.7.2 Business Description
              • 12.7.3 Financial Overview
              • 12.7.4 SWOT Analysis
              • 12.7.5 Key Developments
            • 12.8 MACE GROUP
              • 12.8.1 Key Facts
              • 12.8.2 Business Description
              • 12.8.3 Financial Overview
              • 12.8.4 SWOT Analysis
              • 12.8.5 Key Developments
            • 12.9 MERCURY ENGINEERING
              • 12.9.1 Key Facts
              • 12.9.2 Business Description
              • 12.9.3 Financial Overview
              • 12.9.4 SWOT Analysis
              • 12.9.5 Key Developments
            • 12.10 SKANSKA
              • 12.10.1 Key Facts
              • 12.10.2 Business Description
              • 12.10.3 Financial Overview
              • 12.10.4 SWOT Analysis
              • 12.10.5 Key Developments
            • 12.11 STRUCTURETONE
              • 12.11.1 Key Facts
              • 12.11.2 Business Description
              • 12.11.3 Financial Overview
              • 12.11.4 SWOT Analysis
              • 12.11.5 Key Developments

            PART 13. APPENDIX

            • 13.1 ABOUT THE INSIGHT PARTNERS
            • 13.2 GLOSSARY

      Summary:
      Get latest Market Research Reports on Europe Data Center Construction . Industry analysis & Market Report on Europe Data Center Construction is a syndicated market report, published as Europe Data Center Construction Market to 2027 - Regional Analysis and Forecasts by Type of Construction (General Construction, Mechanical Design, Electrical Design), Tier Standard (Tier 1 & Tier 2, Tier 3, and Tier 4), and Industry Vertical (BFSI, Government, Technology, Telecom, Media & Entertainment, Retail, Healthcare, and Others). It is complete Research Study and Industry Analysis of Europe Data Center Construction market, to understand, Market Demand, Growth, trends analysis and Factor Influencing market.

      Last updated on

      REPORT YOU MIGHT BE INTERESTED

      Purchase this Report

      $3,000.00
      $4,000.00
      $5,000.00
      2,391.00
      3,188.00
      3,985.00
      2,799.00
      3,732.00
      4,665.00
      468,780.00
      625,040.00
      781,300.00
      250,410.00
      333,880.00
      417,350.00
      Credit card Logo

      Related Reports


      Reason to Buy

      Request for Sample of this report